Location: Behind Hyde Park, London
Temporary and permanent steel package delivered within a constrained central London access environment.

The initial scope involved supporting the existing façade with temporary steelwork during strip-out, using complex steel frames designed to retain the structure safely.
Following this, a permanent steel frame was installed across three levels, including six spliced beams with bespoke connection designs.
Beam splicing was selected because significant access restrictions meant no trailer longer than 6 metres could reach the property.
Once the permanent structure was complete, the temporary steelwork was carefully derigged, leaving behind the new steel frame.
Send us your drawings or a quick description and we'll come back with friendly advice and a clear quote. No obligations, no pressure – just honest help.
Ready to start your project? Fill out the form below or give us a call. We typically respond within a few hours.
Phone
0207 870 8160
info@supersteel.co.uk
Address
42 Watling Street
Radlett, Hertfordshire
England, WD7 7NN
Opening Hours
Mon - Fri: 8:00 AM - 5:00 PM
Sat & Sun: Closed