Loading...

Location: St John’s Wood, London
Large-scale bespoke steel package including two structures, intumescent coating and hollowcore slab installation.

The project involved the design, supply and installation of two steel structures weighing a combined 109 tonnes, with both structures coated in 1-hour intumescent paint.
Supersteel also installed over 88 bespoke hollowcore concrete slabs across two levels, including a specially engineered curved steel lintel to satisfy both structural and architectural requirements.
The main structure totalled 100.24 tonnes and required coordinated fabrication and installation alongside concrete planks across two levels.
After holding down bolts were damaged during groundworks, the team carried out an onsite consultation, drilled new holes and rapidly designed new base plates to avoid major programme delays.
Send us your drawings or a quick description and we'll come back with friendly advice and a clear quote. No obligations, no pressure – just honest help.
Ready to start your project? Fill out the form below or give us a call. We typically respond within a few hours.
Phone
0207 870 8160
info@supersteel.co.uk
Address
42 Watling Street
Radlett, Hertfordshire
England, WD7 7NN
Opening Hours
Mon - Fri: 8:00 AM - 5:00 PM
Sat & Sun: Closed